The plumber came this morning and
did this work to put pipes in so that I can install my water filter. He had to do some cutting work inside as well
as outside the house as in the picture.
It seemed to take me a long, long time to get rid of all the grit and
even my eyelashes were heavy with the stuff.
As if that was not enough the
electrician came this evening to install some more plug sockets. This required drilling and even more grit on
the floor.
With electrical and plumbing work
being done in the new office as well there really is grit everywhere.
No comments:
Post a Comment